Prefer to talk to a pro?

Call today, and let us connect you with the perfect merchant!

1-866-334-4659

Call today, and let us connect you with the perfect merchant!


Prefer to talk to a pro?

Call today, and let us connect you with the perfect merchant!

1-866-334-4659

Call today, and let us connect you with the perfect merchant!

Updates & tips

The main factors affecting the cost of steel structure workshop

The steel structure workshop mainly refers to the workshop where the load-bearing members are steel structure . Due to the increase in steel production in China, steel structures have begun to be used in many places. Steel building have short construction periods and low investment costs, so they are very popular in the construction industry. However, due to the span of the workshop, the design plan, the technical requirements and the different regions, the cost of steel structure workshop is also different. So what are the factors that affect the cost of steel workshop ? There are three main factors affecting the cost of steel structure workshop 1. Raw Material Steel and sheet are the main components of the workshop, accounting for about 70%-80% of the total cost of the building. The fluctuation of the market price of steel structure raw materials directly affects the cost of the building . The different section size , steel grade , thickness of wall and roof will cause the different of price , so the raw materials is the main factor that effected the cost of steel workshop building . 2. Design Factor Design factor: Reasonable design can save raw materials and affect the cost of steel structure workshop . Different design plan are important factor for affecting the quantity of steel , directly affecting the total cost . 1) The foundation cost is closely related to the geology of the building . The construction period of the foundation accounts for about 25% of the total construction period . The foundation construction cost is 15% of the total cost of the steel structure workshop. When designing, we should pay attention to the geological report of the location of the building , choose a reasonable basic type, and control the basic surface and depth of the foundation to play a positive role in the total cost . 3. Construction factor The construction time is also part of the cost of the steel structure workshop. The proficiency of the installation technology is the main factory for the construction period. The construction of steelstructure workshop is a systematic project involving a wide range of factors and many influencing factors. The construction period, policy changes, and large amount of engineering can all affect the cost of workshop . Have an efficient and skilled installation team, can save the owner a lot of time and cost!

Steel Structure Building in United State

Qingdao Havit Steel Structure Co.,ltd Design , Fabricate and Delivery Prefab Steel Building Project in United State ,We provided the complete building ,including Aluminum window and roller up door for the building ,the wall and roof panel used high quality metal sheet ,0.6mm thickness , wall and roof with fiber glass wool insulation . The Building including Warehouse and Office Building ,office building in double level , warehouse used double layer single color metal sheet ,inside is 90mm glass wool insulation,steel structure building more and more used for industrial andcommercial building,because the fast construction and easily erection ,green building ,good for environmental . The advantage of Prefab Steel Building as follow : 1)Prefab Steel Building is better than traditional concretebuildingand could meet the requirements of construction better meet the requirements of large bays and big span , reducing the cross-sectional area of the column,increase the area of utilization, effective use of area increases by about 6%. 2)Prefab Steel Building energy saving effect is good, the wall girt using light energy saving standardized C section steel, wall panel could choose 0.5mm corrugated single color sheet and sandwich panel, heat preservation performance is good, good anti-seismic. Energy saving 50%, 3)Prefab Steel Building can give full play to the good ductility of steel structure and plastic deformation ability , it has excellent aseismical performance, wind resistance greatly increased the safety and reliability of the building.Especially in the case of earthquake, typhoon disaster, steel structure building can avoid disruptions to the collapse of buildings 4)Prefab Steel Building with the advantage of light weight , steel structure approximately half of the concrete structure, can greatly reduce the totally cost 5)Prefabricated Steel Buildings quickly construction , shorten at least a third period than the traditional building system, 1000m2 steel building only 20 days before completion, five workers.

Steel Workshop Building in Tanzania

Steel Structure Workshop Building design , fabricated and delivery to Dar es Salaam , Tanzania , the building used as industrial production workshop . The dimension of the Steel Structure Workshop Building : wide (21m + 10m) , Length 140m , the building in various height points , 6m clear , 10m clear and 20m clear ,the mezzanine floor height is 5m . There are four silos on 20m clear height building area , each silo working weight is 100ton , totally 400tons ,the working Platform at 16 Meter Level to access the four silos . Concrete brick wall height is 5m , above used 0.5mm corrugated single color sheet , the roof panel used 50mm thickness PU (Poly urethene ) Sand witch Panels with 0.5 mm SKIN on Both sides . Three set steel stair with handrail inside the building . 2m x 24m canopy on the workshop building . The design information of Steel Structure Workshop Building as follows : Design Code –AISC -89 •Wind Speed -150 KMPH •Building – Dead Load 0.15 KN Per Sq M Live 0.5 KN per Sq M •Mezzanine: Dead Load 3.5 KN per Sq M and Live Load 5 KN Per Sq M •Mezzanine Beams at Silo Area : to be designed for silo weight.